The December Shutdown has been acknowledged as one of the best preventive maintenance projects that Vistakon has conducted. Much of the work that we do during the two extended shutdowns (December and July) can only be done at these times and there is never enough time to do all that we would like to accomplish.
You are one of five contractors competing for time to do desired and/or required projects, along with the normal Vistakon Engineering and Maintenance crews working on equipment and facilities. The success of such a complex project requires teamwork, cooperation and much hard work and sacrifice on the part of everyone concerned. Such spirit was exemplified by your company’s performance during this shutdown.
We would like to take this opportunity to express our appreciation for your contribution to the December Shutdown. The quick return to normal operation, successful completion of all projects and the appearance of the facility is greatly appreciated. Thank you!